Alberta master electrician practice questions with answers

8 free questions with answers and explanations. Each one passed an independent accuracy review, and each is labeled with where it comes from. Open a question to check your answer.

  1. Question 1 · Services & Service Entrance · Master

    General CEC 2024 practice, the edition the Alberta exam uses

    An overhead consumer's service is run to a building over a private driveway used by passenger vehicles. The Master electrician must confirm two things: the maximum permitted point-of-attachment height for the service conductors, and where the service box may not be installed inside the building. Under CEC 2024, which statement is correct?

    1. A.The point of attachment may be any height; the service box must not be installed in a bathroom or a clothes closet
    2. B.The point of attachment must not exceed 7.5 m above grade; the service box must not be installed in any habitable room
    3. C.The point of attachment must be at least 9 m above grade; the service box may be installed anywhere with a lockable cover
    4. D.The point of attachment must not exceed 9 m above grade; the service box must not be installed in a bathroom or a clothes closet
    Show the answer and explanation

    Answer: D. The point of attachment must not exceed 9 m above grade; the service box must not be installed in a bathroom or a clothes closet

    CEC Rule 6-112 limits the point of attachment of overhead consumer's service conductors to not more than 9 m above grade or sidewalk, and Rule 6-206 lists locations where a service box shall not be installed — including bathrooms, clothes closets, coal bins, and stairways, and any location with less than 2 m headroom. The correct statement is that the point of attachment must not exceed 9 m above grade and the service box must not be installed in a bathroom or a clothes closet. The 9 m figure is a ceiling, not a floor.

    Reference: CEC Rule 6-112; Rule 6-206

  2. Question 2 · Special Occupancies · Contractor

    General CEC 2024 practice, the edition the Alberta exam uses

    A grain-handling facility has an area where a cloud of combustible dust is likely to be present in normal operation. A contractor is selecting certified equipment for this area. Which equipment grouping designation applies to the dust hazard?

    1. A.Group IIA, IIB, or IIC
    2. B.Group A, B, C, or D
    3. C.Group IIIA, IIIB, or IIIC
    4. D.Group E, F, or G
    Show the answer and explanation

    Answer: C. Group IIIA, IIIB, or IIIC

    Under the CEC zone system in Rule 18-050, equipment for explosive dust atmospheres (Zones 20/21/22) is grouped as Group IIIA, IIIB, or IIIC, distinguishing combustible flyings, non-conductive dust, and conductive dust. Group IIIA/IIIB/IIIC is therefore the correct designation for a combustible-dust location such as grain handling. The Group II (gas) and the older letter groups belong to other classification systems.

    Reference: CEC 2024 Rule 18-050

  3. Question 3 · Services & Service Entrance · Contractor

    General CEC 2024 practice, the edition the Alberta exam uses

    A renovation client wants the service box (main disconnect) for a new 200 A dwelling service mounted in a finished basement. The most convenient wall is inside a small bathroom near where the underground consumer's service conductors enter the building. As the contractor, what is the correct CEC position?

    1. A.Acceptable, provided the service box has a lockable cover and is at least 1.5 m from the bathtub
    2. B.Acceptable, because the rule only prohibits service boxes in commercial bathrooms, not residential ones
    3. C.Not acceptable — the CEC prohibits installing the service box in a bathroom regardless of dwelling type
    4. D.Acceptable only if a GFCI is installed ahead of the service box
    Show the answer and explanation

    Answer: C. Not acceptable — the CEC prohibits installing the service box in a bathroom regardless of dwelling type

    CEC Rule 6-206 lists locations where service boxes shall not be installed — including bathrooms, clothes closets, coal bins, and stairways, and anywhere with less than 2 m headroom. The correct contractor position is that mounting the service box in a bathroom is not acceptable regardless of dwelling type. The 'as close as practicable to where the conductors enter' allowance does not override the explicit prohibited-location list.

    Reference: CEC Rule 6-206

  4. Question 4 · Business & Project Management · Contractor

    General CEC 2024 practice, the edition the Alberta exam uses

    An electrical contractor is awarded a commercial tenant-improvement job that includes altering existing branch circuits and adding a new subpanel. The site superintendent wants crews to begin roughing-in immediately to hold the schedule. With respect to the administrative requirements of the Canadian Electrical Code, what must be in place before the work proceeds?

    1. A.Only the building permit is required; a separate electrical permit is not part of the Electrical Code framework.
    2. B.A permit issued by the inspection department, as required by the administrative rules of CEC Section 2, before the electrical work is carried out.
    3. C.Nothing in advance — the contractor may begin and simply request inspection once all wiring is complete and energized.
    4. D.Only a permit for the new subpanel; alterations to existing branch circuits are exempt from any permit requirement.
    Show the answer and explanation

    Answer: B. A permit issued by the inspection department, as required by the administrative rules of CEC Section 2, before the electrical work is carried out.

    The administrative rules in CEC Section 2 (Rule 2-004, Permits) require that a permit be obtained from the inspection department before electrical work is carried out, and the answer is a permit issued by the inspection department before the electrical work is carried out. Permit requirements apply to alterations and additions, not just brand-new construction, so beginning rough-in without the electrical permit violates the Code's administrative framework regardless of schedule pressure. Fee and inspection provisions in Section 2 flow from this permit requirement.

    Reference: CEC 2024 Rule 2-004

  5. Question 5 · Dwelling Service Load (CEC) · Master

    General CEC 2024 practice, the edition the Alberta exam uses

    Under CEC Rule 8-200, which load type was added in recent code cycles specifically to address new residential technology, requiring it to be included in dwelling service calculations?

    1. A.Solar photovoltaic generation equipment
    2. B.Smart home control systems
    3. C.Heat pump water heater
    4. D.Electric vehicle charging equipment
    Show the answer and explanation

    Answer: D. Electric vehicle charging equipment

    Per CEC Rule 8-200(1)(a)(vi): CEC Rule 8-200(1)(a)(vi) specifically adds EV charging equipment as a required load component in the dwelling service load calculation. This sub-rule addresses the growing prevalence of residential EV chargers.

    Reference: CEC Rule 8-200(1)(a)(vi)

  6. Question 6 · Business & Project Management · Contractor

    General CEC 2024 practice, the edition the Alberta exam uses

    Equipment that was previously approved is now in service on a contractor's completed installation. During a later visit the inspector finds the units are being used under environmental conditions that make them unsuitable and that they no longer match the sample on which approval was based. Under the Canadian Electrical Code, what authority does the inspection department have?

    1. A.None — once equipment has been approved, that approval is permanent and cannot be revisited by the inspection department.
    2. B.It may only issue a non-binding advisory; rejection requires a separate court order.
    3. C.It may reject the equipment, even though approval was previously granted, where the equipment is substandard to the approved sample, the conditions of use make it unsuitable, or the terms of approval are not being met.
    4. D.It may reject the equipment only if a documented injury or fire has already occurred.
    Show the answer and explanation

    Answer: C. It may reject the equipment, even though approval was previously granted, where the equipment is substandard to the approved sample, the conditions of use make it unsuitable, or the terms of approval are not being met.

    CEC Rule 2-026 (Powers of rejection) provides that even though approval has previously been granted, the inspection department may reject equipment where it is substandard with respect to the approved sample, where the conditions of use indicate it is not suitable, or where the terms of the approval agreement are not being carried out. The correct answer captures exactly this power to reject previously approved equipment under those conditions. Approval is therefore not permanent, and rejection does not require a prior injury or a court order.

    Reference: CEC 2024 Rule 2-026

  7. Question 7 · Conductors & Ampacity · Master

    General CEC 2024 practice, the edition the Alberta exam uses

    A feeder must carry a calculated load of 90 A and is wired with RWU90 aluminum conductors terminating on equipment rated 75°C (30°C ambient, not more than three conductors). Using the CEC 2024 aluminum ampacity table, what is the smallest aluminum conductor permitted for this feeder?

    1. A.No. 6 AWG
    2. B.No. 4 AWG
    3. C.No. 1/0 AWG
    4. D.No. 2 AWG
    Show the answer and explanation

    Answer: D. No. 2 AWG

    Aluminum ampacities come from Table 4. With 75°C terminations the 75°C column governs: No. 2 aluminum is 90 A, which meets the 90 A load, while No. 4 aluminum is only 65 A. The smallest compliant conductor is therefore No. 2 AWG aluminum.

    Reference: CEC Table 4 (aluminum); Rule 4-006

  8. Question 8 · Motor Circuits · Contractor

    General CEC 2024 practice, the edition the Alberta exam uses

    On a CEC motor installation, a contractor must size the running overload (thermal) protection for a motor marked with a service factor of 1.15. Which CEC rule governs the SIZING of that overload protection, and what is the typical maximum percentage of full-load current it permits for this motor?

    1. A.Rule 28-308, at 175% of full-load current
    2. B.Rule 28-306, at 125% of full-load current
    3. C.Rule 28-200, at 250% of full-load current
    4. D.Rule 28-306, at 115% of full-load current
    Show the answer and explanation

    Answer: B. Rule 28-306, at 125% of full-load current

    CEC Rule 28-306 is the rule that sizes motor running (overload) protection, and for a motor with a marked service factor of 1.15 or greater (or a temperature rise of 40°C or less) the overload device is generally rated or set at not more than 125% of the motor full-load current. So Rule 28-306 at 125% of full-load current is correct. Rule 28-308 is a different rule that addresses the conditions under which overload protection may be omitted, not how to size it, and the 175%/250% figures are branch-circuit short-circuit/ground-fault values, not overload values.

    Reference: CEC Rule 28-306

Your Alberta exam at a glance

Code edition the exam tests
CEC 2024

Code edition: the exam vs. the installation code

They match. The Alberta exam and the installation code are both on the CEC 2024 (installation code in effect since April 1, 2025).

What the exam is written on

Journeyperson (Alberta Period 4 apprenticeship and PLA exam, counselling sheet dated Aug 20, 2025): "Canadian Electrical Code Book (2024) 26th Edition may be used with this examination." Master Electrician exam (Safety Codes Council): CEC Part I 26th edition (2024), which the candidate buys, plus the 2024 Exam Kit. The Red Seal / Interprovincial Qualification sheet (Feb 9, 2026) does not name a CEC edition.

Adopted for installations

CSA C22.1-24, Canadian Electrical Code Part I (26th edition), in force province-wide since April 1, 2025, adopted through the Alberta Electrical Code Regulation under the Safety Codes Act.

Who licenses electricians in Alberta, and the license path

Licensing authority: Journeyperson / apprentice: Alberta Apprenticeship and Industry Training (AIT, Government of Alberta, tradesecrets.alberta.ca) under the Skilled Trades and Apprenticeship Education Act (STAEA, in force July 20, 2022; it replaced the Apprenticeship and Industry Training Act).

  1. Master Electrician (Certificate of Competency, Safety Codes Council)

    Hold a journeyperson electrician certificate from Alberta or another province.

  2. Electrical contractor (business)

    Alberta has no separate provincial electrical contractor licence exam.

Alberta master electrician exam content outline

Topics and weights from the Alberta master electrician exam outline
TopicWeight
[Master] Part 1 - Canadian Electrical Code Part I (2024, 26th ed.)50 questions (part score must be at least 60%)
[Master] Part 2 - Calculations70 questions (part score must be at least 60%)
[Master] Alberta legislation in Exam Kit (Safety Codes Act, Certification and Permit Reg, Permit Reg, Electrical Code Reg, Administrative Items Reg, STAE Act, Designated Trades and Restricted Activities Reg, Apprenticeship Education Reg, Electrical STANDATA, OHS Act, WCB Employer Handbook, ME Code of Ethics)Tested within the two parts; weight not published

Key Alberta amendments

  • CEC 2024 (26th ed.) in force April 1, 2025; installations permitted before that date may follow CEC 2021.
  • Alberta STANDATA variance 24-ECV-006-308 allows USEB cable with a bare neutral in underground service entrance installations, restoring a permission the 2024 Rule 6-308 dropped by mistake.
  • Alberta Electrical Utility Code 6th ed. (2022) in force Sept 1, 2023 for utility installations.

Common misconceptions about the Alberta exam

  • WRONG: Alberta uses the NEC or has 'journeyman licenses' from cities/counties. Alberta uses the Canadian Electrical Code Part I. Journeyperson certification is provincial (AIT/STAEA), and municipalities only issue permits and inspect.
  • WRONG: Alberta is still on CEC 2021. CEC 2024 (26th ed.) has been in force since April 1, 2025, and the AB Period 4 exam and the ME exam both use the 2024 26th edition.
  • WRONG: The Master Electrician licence is issued by AIT or Municipal Affairs. It is issued by the Safety Codes Council under the Safety Codes Act and the Certification and Permit Regulation.
  • WRONG: ME eligibility is a fixed hour count (e.g., 4,000 or 8,000 hours) or 2 years. It is 3 of the last 5 years as a journeyperson electrician.
  • WRONG: The ME exam needs a flat 70% or 75% on each part. You need at least 60% on EACH part AND a 75% average.
  • WRONG: The Alberta journeyperson exam has 135 or 150 questions, a 4-hour time limit or a 75%/80% pass. The AB Period 4 exam is 100 questions, 3 hours, 70%.

Official sources for Alberta

Facts verified Oct 19, 2026 against these official sources.

Alberta master electrician exam questions people ask

Which code edition does the Alberta master electrician exam test?

The CEC 2024. Study the edition the exam is written on.

What references can I bring to the Alberta master electrician exam?

JOURNEYPERSON: (a) Alberta Electrician Period 4 Apprenticeship and PLA theory exam (03/04/25/10, CE12519-1, dated Aug 20, 2025): 100 multiple-choice questions, 3 hours, pass mark 70%, CEC 2024 26th ed. may be used (code-book open).